Would like to be able to drag a subtask into Gcal and not have to 1) put the whole task in or 2) have to break the subtask into a separate task. For example if I had a project with A B C D subtasks each taking 30 min, I don't want to have to move the whole 2 hour block onto the calendar, but I will want all of them to be part of the same parent task. I am not sure if this is a feature already, but I certainly hope so.