So basically it seems to me the current way task import works is that it takes a subset of all the information of a task and creates the Sunsama task just from that; seemingly just the task name. I would like it if it maintained and ported all the informations about the task to Sunsama, such as subtask and due dates as it almost in a way defeats the point of the Todoist integration. Additionally, it seems like many of the features of Todoist that aren't imported in task import to Sunsama exist in Sunsama like the aforementioned sub tasks and due dates all while the Sunsama task is linked to the Todoist task with all that information visible.
The reason I would like to see this change is that it would allow the time planned feature to work better as I could schedule the subtask more fluidly without having to replicate them into Sunsama